INDUSTRIAL SURFACE

This page is for information purposes only. The official document is SportMaster's PDF: PickleMaster Surfacing System over asphalt (CMT-71, revised March 2025).

SportMaster · Engineering specification

PickleMaster Surfacing System over asphalt

SportMaster's engineering specification, CMT-71, for the PickleMaster Surfacing System over asphalt pickleball court surfaces. New asphalt cures 14 to 30 days; cracks are filled, depressions 1/8 inch or deeper leveled and one or two coats of Acrylic Resurfacer applied (a minimum of 2 on new asphalt). A minimum of two coats of the PickleMaster Surfacing System follows, with lines laid out to USAPA specifications and a minimum of one coat of Line Paint over Stripe Rite primer.

CMT-71 Revised March 2025 1 page, 113 KB

Open the PDF Ask us about it

This is SportMaster's document, described here so our customers and crews can read it beside our own pages. The PDF itself is not kept on this site: every link to it opens SportMaster's own file. SportMaster publishes it at sportmaster.net.

First page of the SportMaster engineering specification for PickleMaster Surfacing System over asphalt Open the PDF (1 page, 113 KB)

Key facts

SystemPickleMaster Surfacing System
SurfaceAsphalt
Cure before coatingNew asphalt: 14 to 30 days
Resurfacer coatsOne or two coats of Acrylic Resurfacer; a minimum of 2 on new asphalt
Color coatsA minimum of two coats of the PickleMaster Surfacing System
Line markingLaid out according to USAPA (USA Pickleball Association) specifications

Taken from this document. The PDF is SportMaster's official document (CMT-71, revised March 2025).

The full text of this document

This is the document's own text, moved from the PDF by machine, word for word, and checked against it. The PDF is SportMaster's official document (CMT-71, revised March 2025). If the two ever differ, the PDF is right.

Engineering Spec Sheet · CMT-71 · REVISED 03/25 · Specifications for applying · PICKLEMASTER SURFACING SYSTEM · over Asphalt Pickleball Court Surfaces

PRODUCT NAME

PickleMaster Surfacing System over asphalt Pickleball court surfaces.

DISTRIBUTION LOCATIONS

SportMaster products are distributed through a worldwide network of stores and distributors. Call (800)395-7325 or visit www.sportmaster.net to find a location near you.

1. SCOPE:

1.1 The following specifications pertain to the application of the PickleMaster Surfacing System over asphalt sport surfaces. Refer to Product Technical Data sheets for specific mixing and application instructions.

1.2 SportMaster color coating systems are designed for use on properly built sport surfaces. Refer to the American Sports Builders Association for recommended guidelines on construction of pickleball court surfaces.

2. SURFACE PREPARATION:

2.1 New Asphalt surfaces must cure 14 to 30 days prior to application. The surface must be cleaned entirely of dust, dirt, debris, and all loose materials.

2.2 Fill all cracks with SportMaster Crack Magic, Acrylic Crack Patch, Acrylic Patch Binder or other suitable crack filler.

2.3 Level depressions or “bird baths” (1/8 inch or deeper) with SportMaster Acrylic Patch Binder or Acrylic Resurfacer patching mix.

2.4 Apply one or two coats of SportMaster Acrylic Resurfacer, as required by surface roughness and porosity, to provide a smooth underlayment for application of the SportMaster Color System. A minimum of 2 coats are recommended on new asphalt surfaces.

3. APPLICATION OF PICKLEMASTER COLOR SYSTEM:

3.1 Over properly prepared asphalt, surface apply a minimum of two coats of the PickleMaster Surfacing System in accordance with manufacturer’s mixing and application instructions.

4. LINE MARKINGS:

4.1 Line markings shall be laid out according to USAPA (USA Pickleball Association) specifications.

4.2 After masking tape has been laid, apply SportMaster Stripe Rite line primer to seal voids between masking tape and court surface to prevent “bleed under” when SportMaster Line Paint is applied.

4.3 Apply a minimum of one coat of SportMaster Line Paint.

5. GENERAL:

5.1 All work shall be performed in a workman like manner. All containers and debris shall be removed from job when completed.

Copyright© 2025, SportMaster
All rights reserved.

ThorWorks Industries, Inc.
P.O. Box 2277
Sandusky, OH 44870

Phone: 1-800-326-1994 FAX: 1-419-626-5477 www.sportmaster.net

Free estimates

Planning a court or a surface?

Industrial Surface is a SportMaster authorized installer in Northeast Ohio. Send the address and what you have in mind; we walk the site, measure it, and send a written proposal with the scope spelled out.

The yard

4000 East 86th Street, Cleveland, OH 44105

Off Broadway Avenue, south of downtown, ten minutes from I-77 and I-490.

Serving Cuyahoga, Summit, Lake, Lorain, Medina, Geauga, Portage, Stark and Ashtabula counties. Municipal, school, club, HOA and commercial work; residential courts by the job.