INDUSTRIAL SURFACE

SportMaster · Engineering specification

ProCushion System over asphalt

SportMaster's engineering specification, CMT-26, for the ProCushion System over asphalt court surfaces. New asphalt cures 14 to 30 days, then cracks are filled, depressions 1/8 inch or deeper leveled and one or two coats of Acrylic Resurfacer applied. The standard system adds (3) coats of CushionMaster II and (2) of CushionMaster I; the premium system (5) coats of CushionMaster II and (2) of CushionMaster I. A minimum of two color coats and one coat of Line Paint finish it.

CMT-26 Revised February 2022 1 page, 75 KB

Open the PDF Ask us about it

This is SportMaster's document, kept here so our customers and crews can read it beside our own pages. SportMaster's own copy is on sportmaster.net.

First page of the SportMaster engineering specification for ProCushion System over asphalt Open the PDF (1 page, 75 KB)

Key facts

SystemSportMaster ProCushion System
SurfaceAsphalt
Cure before coatingNew asphalt: 14 to 30 days
Cushion layersStandard: (3) coats of CushionMaster II, then (2) coats of CushionMaster I. Premium: (5) coats of CushionMaster II, then (2) coats of CushionMaster I
Color coatsA minimum of two coats of the SportMaster Color Coating System
Line markingLaid out according to the relevant sport organization instructions

Taken from this document. The PDF is SportMaster's official document (CMT-26, revised February 2022).

The full text of this document

This is the document's own text, moved from the PDF by machine, word for word, and checked against it. The PDF is SportMaster's official document (CMT-26, revised February 2022). If the two ever differ, the PDF is right.

Engineering Spec Sheet · CMT-26 · REVISED 02/22 · Specifications for applying · SPORTMASTER PROCUSHION SYSTEM · over Asphalt Court Surfaces

PRODUCT NAME

SportMaster ProCushion System over asphalt court surfaces.

DISTRIBUTION LOCATIONS

SportMaster products are distributed through a worldwide network of stores and distributors. Call (800)395-7325 or visit www.sportmaster.net to find a location near you.

1. SCOPE:

1.1 The following specifications pertain to the application of the SportMaster ProCushion System over asphalt court surfaces. Refer to Product Technical Data sheets for specific mixing and application instructions.

1.2 SportMaster color coating systems are designed for use on properly built sport surfaces. Refer to the American Sports Builders Association for recommended guidelines on construction of court surfaces.

2. SURFACE PREPARATION:

2.1 New Asphalt surfaces must cure 14 to 30 days prior to application. The surface must be cleaned entirely of dust, dirt, debris, and all loose materials.

2.2 Fill all cracks with SportMaster Crack Magic, Acrylic Crack Patch, Acrylic Patch Binder or other suitable crack filler.

2.3 Level depressions or “bird baths” (1/8 inch or deeper) with SportMaster Acrylic Patch Binder or Acrylic Resurfacer patching mix.

2.4 Apply one or two coats of SportMaster Acrylic Resurfacer, as required by surface roughness and porosity, to provide a smooth underlayment for application of the SportMaster ProCushion System. A minimum of 2 coats are recommended on new asphalt surfaces.

3. APPLICATION OF PROCUSHION SYSTEM LAYERS:

3.1 Over properly prepared surface, apply (3) coats of CushionMaster II followed by (2) coats of CushionMaster I for the standard ProCushion system. For the premium ProCushion system, apply (5) coats of CushionMaster II followed by (2) coats of CushionMaster I.

4. APPLICATION OF SPORTMASTER COLOR SYSTEM:

4.1 Over properly prepared cushion layers, apply a minimum of two coats of the SportMaster Color Coating System in accordance with manufacturer’s mixing and application instructions.

5. LINE MARKINGS:

5.1 Line markings shall be laid out according to the relevant sport organization instructions.

5.2 After masking tape has been laid, apply SportMaster Stripe Rite line primer to seal voids between masking tape and court surface to prevent “bleed under” when SportMaster Line Paint is applied.

5.3 Apply a minimum of one coat of SportMaster Line Paint.

5. GENERAL:

5.1 All work shall be performed in a workman like manner. All containers and debris shall be removed from job when completed.

Copyright© 2020, SportMaster
All rights reserved.

ThorWorks Industries, Inc.
P.O. Box 2277
Sandusky, OH 44870

Phone: 1-800-326-1994 FAX: 1-419-626-5477 www.sportmaster.net

Free estimates

Planning a court or a surface?

Industrial Surface is a SportMaster authorized installer in Northeast Ohio. Send the address and what you have in mind; we walk the site, measure it, and send a written proposal with the scope spelled out.

The yard

4000 East 86th Street, Cleveland, OH 44105

Off Broadway Avenue, south of downtown, ten minutes from I-77 and I-490.

Serving Cuyahoga, Summit, Lake, Lorain, Medina, Geauga, Portage, Stark and Ashtabula counties. Municipal, school, club, HOA and commercial work; residential courts by the job.